Gamma Petroleum services

Gamma Petroleum Services

GPS

Gamma Petroleum Services

is a global company provide specialized services to oil and gas production and drilling contractors. The company was established with the objective of providing a comprehensive package of Oil Field NDT, Lifting, Tubular, BHA, pipe line, pressure line, storage tanks, calibration,

Rig inspection

GPS is providing the following kinds of inspection to Drilling / Work over Rigs and affiliates :(Onshore and Offshore)

Full package rig inspection (including CAT.4). To make full inspection to the rig parts / equipment's according to

Lifting Inspection

GAMMA is an official British Standard institute Member which gives us the ability to ensure all work carried out by our engineers is in full compliance with all BSI standards. Having also the privilege for giving our clients an account  of GAMMA to view all the latest standards

Explosion Proof

Inspection and maintenance of electrical installations within hazardous areas only, where the hazard may be caused by flammable gases, vapors, mists, dusts, fibers or flying. Movable equipment , Movable equipment and its connections

Rig Inspection:

Rig ins GPS is providing the following kinds of inspection to Drilling / Work over Rigs and affiliates: t Full package rig inspection (including CAT.4). To make full inspection to the rig parts / equipment's according to

  • API 4F Specification for Drilling and Well Servicing Structures.
  • API 4G Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing Structures.
  • API 5D Specification for Drill Pipe
  • API 7K Drilling and Well Servicing Equipment
  • API 7L Procedures for Inspection, Maintenance, Repair, and Remanufacture of Drilling Equipment.
  • API 8A Specification for Drilling and Production Hoisting Equipment.
  • API RP 8B Recommended Practice for Procedures for Inspections, Maintenance, Repair and Remanufacture of Hoisting Equipment.
  • API 8C Drilling and Production Hoisting Equipment (PSL 1 and PSL 2)
  • API 9A Specification for Wire Rope
  • API 16D Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
  • API RP 7G -2 Recommended Practice for Inspection and Classification of Used Drill Stem Elements.
  • API Spec 6A Specification for Wellhead and Christmas tree Equipment
  • API spec 7 Specification for Rotary Drill Stem Elements
  • ASTM E 213 Standard Practice for Ultrasonic Examination of Metal Pipe Tubing.
  • ASTEM 317 Standard Practice for Evaluating Performance Characteristics of Ultrasonic Pules- Echo Testing Systems Without the Use of Electronic Measurement Instruments.
  • ASTM E 570 Standard practice for Flux leakage examination of Ferro magnetic Steel Tubular
  • ASTM E 709 Standard Guide for Magnetic Particle Inspection.
  • ASTM E 1316 Standard Terminology for Non Destructive Examination.
  • ASTM E 1324 Standard Guide for Measuring Some Electronic Characteristics of Ultrasonic Examination Instruments.
  • ASTM E 1359 Standard Guide for Evaluating Capabilities of Non Destructive Testing Agencies.
  • ASTM E 1065 Standard Guide for Evaluating Characteristics of Ultrasonic Search Units.
  • ASTM RP 8B Hoisting Equipment.
  • DS -1TM TH Hill Standard Drill Stem Design and Inspection.
  • EMQSP 6.5 Company SEA, MPI and Full Body Inspection System Prove-up.
  • EMQSP 6.9 Company Full-Length Pipe Body Inspection.
  • ISO TS 29001 Petroleum, Petrochemical and Natural Gas Industries-Sector Specific Quality Management Systems-Requirements for product and Service Supply Organizations.
  • ISO 4309 & 4310 Crane-Teat Code and Procedures crane-wire rope-Care and Maintenance.
  • ISO 9927-1&3 Crane-Inspection Part 1
  • BSI British Standard Inspection.
  • NS-2 Drill String Inspection Standard, Fernley Proctor Group.
  • IEC 60079-10-1 ed1.0 (2008-12) TC/SC 31J Explosive Atmospheres - Part 10-1: Explosive Gas Atmospheres.
  • IEC 60079-10-2 ed2.0 (2015-01) TC/SC 31J Explosive atmospheres - Part 10-2: Explosive dust atmospheres.
  • IEC 60079-14 ed5.0 (2013-11) TC/SC 31J Explosive atmospheres - Part 14: Electrical installations design, selection and erection.
  • IEC 60079-17 ed5.0 (2013-11) TC/SC 31J Explosive atmospheres - Part 17: Electrical installations inspection and maintenance.
  •  

    Rig Unit Inspection Parts

  • 1-Crown Block and Water Table
  • 2-Cat line Boom and Hoist Line
  • 3-Drilling Line
  • 4-Monkey board
  • 5-Traveling Block
  • 6-Top Drive
  • 7-Mast
  • 8-Drill Pipe
  • 9-Doghouse
  • 10-Blowout Preventer
  • 11-Water Tank
  • 12-Electric Cable Tray
  • 13-Engine Generator Sets
  • 14-Fuel Tanks
  • 15-Electric Control House
  • 16-Mud Pump
  • 17-Bulk Mud Components Storage
  • 18-Mud Pits
  • 19-Reserve Pits
  • 20-Mud Gas Separator
  • 21-Shale Shaker
  • 22-Choke Manifold
  • 23Pipe Ramp
  • 24-Pipe Racks
  • 25-Accumulator
  • 26-Annulus
  • 27-Brake Bands
  • 28-Casing Head
  • 29-Cathead
  • 30-Catwalk
  • 31-Cellar
  • 32-Conductor Pipe
  • Mast to be included

     

    ( Crown Block ,sheaves , Rig Mast Sections ,Derrick Floor , Sub Structure ,travel block ,TDS ,rising line BOP crane trolley ,cat line ,stairs ,V-Door ,escape line )

    MUD SYSTEM. To be included:

     

    ( Mud Tanks , water tanks ,Trip Tank ,Shale Shakers ,Mud Cleaner ,Agitators ,Pumps ,C. Pumps Pressure Lines ,Mud Guns ,walk Ways ,Valves degasser )

    Well control system. To be included:

     

    (Accumulator, BOP's, Chock Manifold, Hydraulic system ..etc )